Project Portfolio · 2026

Built for franchise operators.

Trivex Group is a Burlington, Ontario commercial general contractor delivering restaurant build-outs, franchise rollouts, and regulated facility programs across Ontario and Atlantic Canada.

Burlington, ON Construction Management · Commercial Build-Outs · Franchise Rollouts 10 documented projects

Track record at a glance

50+
Projects Delivered
3
Sectors Served
4
Provinces
$483K
Max Project Value

Core capabilities

Turnkey commercial construction.

Trivex delivers full-scope commercial build programs — from demolition through municipal turnover — under a single prime contract.

01

Restaurant & QSR Build-Outs

Full-scope restaurant and QSR build-outs from demolition through turnover.

02

Commercial Kitchen Systems

Hood exhaust, MUA, fire suppression, and commercial kitchen infrastructure.

03

MEP Coordination

HVAC, plumbing, electrical, and gas across all trade disciplines.

04

Franchise Rollout Programs

Multi-location franchise execution with repeatable, disciplined delivery.

05

Custom Millwork & Finishes

Interior finishes, architectural features, and branded millwork.

06

Permit & Compliance Management

Permit coordination, inspection management, and code compliance.

Case studies

Selected projects from the past five years.

Abo Alabed / Baba Kanafa dual-concept restaurant build-out mid-construction, Mississauga
Commercial kitchen exhaust installation in progress
Architectural feature wall and millwork install
$483,750
Project Value
In Progress Mississauga, ON

Abo Alabed / Baba Kanafa

Dual-Concept Restaurant Build-Out · Prime Contractor

Client
Farooj Abo Alabed & Baba Kanafa
Sector
Dual-Concept QSR
Location
4700 Ridgeway Dr, Mississauga
Project Value
$483,750

Trivex was engaged to deliver a full dual-concept restaurant build-out for Farooj Abo Alabed and Baba Kanafa at 4700 Ridgeway Drive, Mississauga. The scope encompasses architectural construction, full MEP systems, and a specialized commercial kitchen exhaust and gas infrastructure program — integrating premium finishes including limestone feature walls, decorative wood panels, an interior glazing wall system, and a custom arched entrance within a single contiguous operational kitchen.

Scope
  • Selective demolition and metal stud framing
  • Drywall, ceramic subway tile, limestone natural brick feature walls
  • Stainless steel kitchen panels, decorative wood panels, interior glazing wall
  • Floor tile (1,680 sq ft), custom millwork, countertops, and cabinetry
  • Full plumbing: washroom, grease interceptor, backflow preventer
  • Electrical rough-in and finishing (ESA Certificate included)
  • HVAC ductwork, new rooftop units with curb and connection
  • Data, low voltage, POS, communications, sound, and surveillance
  • Commercial kitchen exhaust: hood canopies, exhaust fans, MUA units, fire suppression, welded ductwork
  • Gas piping, regulators, valves, and appliance connectors
Execution
Dual-concept brand integration
Two distinct restaurant identities delivered simultaneously, each with unique finish, counter, and branding requirements within a single contiguous space.
Commercial kitchen exhaust complexity
A $186,500 exhaust system including welded ductwork, fire suppression, MUA units with gas duct heaters, and structural reinforcement, demanding precise engineering coordination.
Architectural feature execution
Premium finishes including a 60-ft limestone counter wall, arched store entrance, decorative wood panel system, and custom glazing wall required skilled trade coordination.
MEP systems density
Plumbing, electrical, HVAC, RTU, gas, data, sound, and surveillance coordinated within a single restaurant footprint with disciplined sequencing across all trades.

Full architectural, MEP, and kitchen exhaust scope under a single prime contract. ESA Certificate and full code compliance included. 1-year warranty on all completed work.

Boustan Fredericton completed counter and commercial kitchen build-out
Boustan service counter detail
Boustan dining and brand finishes
Boustan back-of-house build
Completed Fredericton, NB

Boustan

Franchise Rollout · Construction Management

Client
Gala Franchise Group
Sector
QSR Restaurant
Size
1,500 sq ft
Project Value
$398,695

Trivex delivered this Boustan location as part of Gala Franchise Group's regional expansion program. The project required full restaurant build-out within a defined rollout schedule, integrating brand standards, commercial kitchen infrastructure, and multi-trade coordination inside a commercial plaza environment.

Scope
  • Site preparation and structural framing
  • Electrical, lighting, plumbing, and drainage
  • HVAC and gas line installation
  • Commercial kitchen exhaust system
  • Fire protection coordination
  • Custom millwork and interior finishes
  • Walk-in cooler and freezer installation
  • Permitting, inspection management, and final turnover
Execution
Mechanical integration
Early assessment of rooftop and service capacity ensured kitchen exhaust and HVAC systems integrated without delay against tight rollout dates.
Inspection & permit sequencing
Multi-trade inspection scheduling managed end-to-end to prevent bottlenecks during final construction stages.
Brand compliance
Millwork, finishes, and equipment coordinated to align with Boustan's franchise standards across every customer-facing element.

Turnkey restaurant facility delivered. Schedule milestones maintained, inspection approvals achieved without delay, fully compliant and operational on handover.

Mezza Lebanese Kitchen Bridgewater completed restaurant with branded counter
Mezza branded counter and millwork
Mezza dining finishes
Mezza kitchen back-of-house
Completed Bridgewater, NS

Mezza Lebanese Kitchen

Franchise Rollout · Construction Management

Client
Mezza Lebanese Kitchen
Sector
QSR Restaurant
Size
1,610 sq ft
Project Value
Confidential

Trivex delivered this Mezza Lebanese Kitchen location as part of a franchise expansion program in Atlantic Canada. The build involved a full QSR fit-out within a defined commercial retail footprint, integrating brand-specific kitchen infrastructure, finishes, and mechanical systems. Consistency and execution discipline were central to delivery as part of a multi-location growth strategy.

Scope
  • Full demolition and site preparation
  • Structural framing and partition installation
  • Plumbing and electrical rough-ins
  • HVAC and gas line installation
  • Commercial kitchen hood exhaust system
  • Walk-in cooler and freezer
  • Millwork and branded interior finishes
  • Inspection, permit coordination, and final commissioning
Execution
Mechanical infrastructure
Early coordination ensured kitchen exhaust and HVAC systems integrated within landlord base-building constraints.
Trade sequencing discipline
Sequenced mechanical and finishing trades to align with the franchise launch timeline.
Brand compliance alignment
All finishes and millwork executed strictly to Mezza's design standards.

Inspection approvals secured, opening schedule protected, and full operational handover achieved.

barBurrito Upper Tantallon completed storefront with branded counter and menu boards
barBurrito service counter
barBurrito dining interior
barBurrito back-of-house build
Completed · March 2024 Upper Tantallon, NS

barBurrito

Franchise Rollout · Prime Contractor

Brand
barBurrito
Sector
QSR Restaurant
Completed
March 2024
Project Value
$295,000

Trivex delivered this barBurrito location as part of a regional franchise rollout. The project required full restaurant construction including mechanical-heavy kitchen infrastructure, gas systems, and inspection coordination on a compressed schedule. This location reinforced Trivex's ability to support repeatable QSR expansion programs.

Scope
  • Demolition and site preparation
  • Plumbing and electrical rough-ins
  • HVAC installation
  • Commercial hood exhaust system
  • Gas line installation
  • Walk-in cooler and freezer
  • Engineering letters and inspections
  • Turnkey construction management
Execution
Gas & exhaust integration
Commercial hood exhaust and gas infrastructure coordinated within landlord servicing constraints.
Inspection scheduling strategy
Inspections sequenced to prevent delays during the final build stages.
Franchise rollout coordination
Delivery milestones aligned with the broader franchise expansion schedule.

Full compliance achieved, opening timeline maintained, and structured repeatable execution delivered.

M&M Food Market Store #244 completed retail interior with display freezers and signage
M&M Food Market display cases
M&M Food Market interior finishes
M&M Food Market service area
Completed White Rose Drive, NL

M&M Food Market

Retail Food · Construction Management · Store #244

Brand
M&M Food Market
Sector
Retail Food
Schedule
8 weeks · 16 trade divisions
Project Value
$224,298

Trivex delivered a full interior build-out for M&M Food Market Store #244 at 70 White Rose Drive, NL. The project encompassed a comprehensive multi-trade scope including general construction, mechanical, electrical, and plumbing systems across an 8-week construction schedule under engineering oversight from AtkinsRéalis.

Scope
  • Project management and site supervision (8 weeks)
  • Demolition, concrete cutting, trenching, and coring
  • Concrete slab reinstatement and rough carpentry
  • Dry merchandise unit and interior signage installation
  • Drywall, ceiling, patch and repair finishes
  • VCT flooring — 1,900+ sq ft
  • Painting, wall coverings, wall and corner guards, FRP service walls
  • HVAC, fire protection piping, plumbing, and electrical
  • Testing, adjusting, balancing, final cleaning, and disposal
Execution
Multi-division trade coordination
16 construction divisions coordinated simultaneously — HVAC, plumbing, electrical, and finishing trades — within an 8-week schedule.
Retail brand standard compliance
All finishes, signage, and millwork executed to M&M Food Market's corporate retail standards with zero variance.
AtkinsRéalis contract requirements
Delivered under rigorous engineering oversight with detailed documentation, MF Code spec compliance, and structured milestone reporting.

All 16 trade divisions completed on schedule. HST-inclusive grand total $224,298.42. Full code compliance and operational handover achieved within the 8-week program.

Twin Lakes Veterinary Hospital Orillia completed medical interior with treatment area
Twin Lakes Vet treatment area
Twin Lakes Vet exam room
Twin Lakes Vet equipment and finishes
Completed Orillia, ON

Twin Lakes Veterinary Hospital

Medical Facility · Construction Management

Client
Twin Lakes Veterinary Hospital
Sector
Healthcare / Medical
Size
4,500 sq ft
Scope
Electrical

Trivex delivered electrical demolition and installation for a 4,500 sq ft veterinary medical facility. The work required coordination inside a regulated healthcare environment with compliance to engineered drawings and operational standards. This project demonstrates Trivex's capability beyond restaurant environments, operating in regulated, precision-critical facilities.

Scope
  • Electrical demolition
  • Installation per engineered drawings
  • Medical-grade coordination
  • Inspection and compliance management
Execution
Healthcare environment coordination
Work adhered to medical facility standards and regulatory compliance requirements throughout the project.
Precision installation
Executed installations aligned strictly with engineered specifications without deviation from approved drawings.

Code compliance achieved, inspection approvals secured, and structured delivery completed in a regulated environment.

Selected work

Additional projects across the portfolio

Jul 2024

Lazeez Shawarma

Brampton, ON

Adaptive reuse of an existing Pizza Pizza unit, divided into two independent restaurant operations. The project demanded structural modification, mechanical upgrades, and precise coordination to accommodate dual tenancies.

QSR Restaurant $220,000
Nov 2019

Ozzy's Burgers

Concord, ON

Full-service restaurant build-out supporting Ozzy's Burgers brand growth through structured mechanical and kitchen infrastructure installation within a defined commercial retail footprint.

QSR Restaurant $285,000
Burger Factory May 2018

Burger Factory

Scarborough, ON

Full-service QSR build including mechanical, gas, and commercial kitchen exhaust systems. High-intensity coordination across mechanical and finishing trades within a defined commercial footprint.

QSR Restaurant $349,000
Wings-Up May 2024

Wings-Up

Mississauga, ON

Renovation of an existing Wings-Up location, including dining area modernization and washroom upgrades, delivered with minimal disruption to ongoing operations.

Renovation $43,957

The model

One coordinated contract. Regional execution.

Trivex operates as a Burlington-based prime contractor with a coordinated network of vetted regional partners. Every project sits under a single Trivex contract, single point of accountability, and a disciplined trade-sequencing playbook — with execution carried by partners who already know their local code, inspectors, and labour pool.

For franchisors and multi-unit operators, the practical advantage is repeatability. The standards that get a build approved in Burlington translate cleanly to Fredericton, Bridgewater, or Upper Tantallon — without losing speed or quality on rollout number five, ten, or twenty.

Single prime contract. Local execution. Engineer-of-record coordination, municipal permit and inspection management, and brand-standard compliance delivered turnkey across every market we operate in.

01

Consistency at scale

Brand standards delivered identically across every market — same scope, same finishes, same inspection rigor.

02

Local expertise

Regional partners know provincial code, municipal inspectors, and labour markets. No remote project managers learning on the job.

03

Faster mobilization

Trades are pre-vetted and pre-scheduled across our coverage area, so new locations break ground without sourcing delays.

Coverage

Active in 4 provinces.

Trivex projects have been completed in Ontario, Nova Scotia, New Brunswick, and Newfoundland. Cities served include Burlington, Mississauga, Brampton, Concord, Scarborough, Orillia, Fredericton, Bridgewater, Upper Tantallon, and communities across Newfoundland.

YT NT NU BC AB SK MB ON QC NB NS PE NL
Active markets
Other provinces
Project cities

Next steps

Planning a rollout?

We deliver multi-location restaurant and retail programs across Ontario and Atlantic Canada under a single prime contract. Tell us about your project and we'll come back with a realistic timeline and number within a week.

Office

5063 North Service Road
Burlington, ON L7L 5H6


Direct

info@trivexgroup.com +1 (888) 814-8388

Compliance

WSIB cleared. Commercial liability and builder's risk insurance maintained on every project.